NOTICE: THE CITY OF SHELTON HAS SET UP A PHONE LINE, 203-924-3029, WHERE HOMEBOUND & VULNERABLE AT-RISK SHELTON REISDENTS, WHO SEEK A COVID AT-HOME TEST & MASK, CAN CALL AND LEAVE THER NAME, ADDRESS & PHONE NUMBER. ALSO, THE WEBSITE TO ORDER FREE COVID AT-HOME TEST KITS FROM THE FEDERAL GOVERNMENT IS OPEN & AVAILABLE TO PLACE YOUR ORDER. THE WEBSITE IS http:www.covidtests.gov/. IF YOU KNOW SOMEONE WHO DOES NOT HAVE INTERNET CAPABILITY, PLEASE SHARE THE FEDERAL PHONE, 1-800-232-0233, TO REQUEST 4 FREE COVID AT-HOME TEST KITS. ONE ORDER PER RESIDENTIAL ADDRESS. ONE ORDER INCLUDES 4 INDIVIDUAL RAPID ANTIGEN COVID-19 TESTS. ORDERS WILL SHIP FREE.

Location: City Hall

Address: 54 Hill Street – Third Floor

City, State: Shelton, CT 06484

Telephone: (203) 924-1555 ext. 1517

Fax: (203) 922-1206

Hours: Tuesday – Friday 8:00 A.M. – 5:30 P.M.

Inspector

Office Hours: Tuesday – Friday 8:00 A.M. – 9:00 A.M., 1:00 P.M. – 2:00 P.M., 4:30 P.M. – 5:00 P.M.

Dept. Head: Joseph Ballaro, Building Official

Email: Joseph Ballaro


 

Building Department

It is the responsibility of this Department to ensure public safety, health and welfare as they are affected by building construction. Compliance

to State Building Codes is enforced to secure safety to life and property. The Building Department is responsible for plan review, issuing

permits, completing inspections and issuing Certificates of Occupancy for all phases of building construction. Other responsibilities include

demolition of buildings and housing code inspections.

Building in Shelton

The Building Department of the City of Shelton has prepared this information to aid you in obtaining the permits required for any kind of

construction, addition or home improvements. It is our aim to better service all applications, issue permits promptly and, in general, help as

much as possible to the completion of your project. We want to service your needs as quickly and efficiently as possible in accordance with all

Statutes, Codes and Ordinances that apply. Remember, safety and health are keynotes in any kind of construction. Our prime interest is to

assure that you, your customer, or your buyer will have the best finished product possible.

Procedure to Obtain a Building Permit & Sequence of Inspections

This applies to all construction. It includes new homes, renovations/rehabilitation, single/multiple dwellings, garages, solar, swimming pools,

sheds, barns, commercial/industrial buildings, signs, demolition, as well as, fences, walls and terraces exceeding six feet in height.

1. Site plan approval, plot plans (includes engineer, architect, landscape, etc. drawings for approval), as applicable to project

developments, condominiums, etc. – Planning & Zoning Commission and approval of Inland Wetlands

2. Apply for zoning compliance (Planning & Zoning Office)

a. Apply to Engineering Dept. for street number assignment for all building lots

b. Apply for Inland Wetlands compliance

c. Apply for Tree Warden compliance

d. Copy of contractor’s license & certificate of insurance

3. Sewage system permit and approval of plans – Valley Health Dept. or Shelton Sewer Commission approval or Sewer Administrator

4. Driveway permit application – Engineering Dept.

5. Permits – Issued by Building Official or Assistant – Building, Solar, Generator, Electrical, Plumbing, Heating, A/C, Demolition,

Swimming Pools, Signs, Wood Stove

6. Construction begins – Inspections required:

a. Footing (before concrete is poured)

b. Foundation or finished masonry (before backfill) damp/waterproofing and footing drains

c. Rough inspection including framing (shell, roof, bearing walls, fireplace, etc.), plumbing, heating and electrical

d. Insulation

e. Final on building – includes grading and soil stability

7. Other inspections, as and if required:

a. Inland Wetlands

b. Fire Services

c. Police Services

d. Driveway – Engineering

e. Well water approval – Valley Health Dept

f. Sewage (Sanitary System) – VHD or Sewer Administrator

g. Certificate of Zoning compliance

h. Final Certificate of Occupancy inspection (CO MUST BE OBTAINED AT THE BUILDING OFFICE)

8. Special Calls

a. Temporary Electric Service

b. Service connection on building

All previous inspections, as listed and as applicable, must be completed and approved before Certificate of Occupancy may be issued.

NOTES:

1. Step 1, as applicable, must be completed before any further action may be taken

2. Steps, 2, 3, and 4 must be completed before going to step 5

3. After Building Permit has been issued, step 6, construction, may start. Other permits required must be applied for and issued

before any of the related work may be started

4. Inspections, as required and as applicable, will be made as requested, but need not necessarily be in the order listed

Procedure to Obtain a Building Permit & Sequence of Inspections

Building In Shelton

Chimney Liner

Plumbing Permit

Demolition Permit

Electrical Permit

Generator Permit

Heating Permit

Sign Permit

Solar Supplement

Wood Stove Permit

There is the option of hiring an essay writer who can assist to get you started creating essays. The essay writing services have numerous advantages. First of all, it is time-saving, and it can improve and proofread your essay. It will also detect plagiarism, so that you don't duplicate your work or copy it from someone else. The third reason is that it will assist you in finding the most effective through reading testimonials of past customers. It is important to choose the company that will treat the client with respect and not use the services they provide.